AD Plant, East Wretham

AD Plant, East Wretham

Plandescil were appointed to carry on their longstanding relationship with R. G Abrey Farms to help with the initial design and surveys for planning permission.

Subsequently, following planning, we engaged in discharging conditions, including Drainage Design and Phase 2 Contamination, and a design and build package with a local contractor. 

The plant has a waste permit and has drainage, containment and lagoon designed to the latest Ciria and Environment Agency guidance.

We were involved day to day on the site until completion with Site Management, Process Changes, Setting Out and As-Built Surveys.

Client

R. G. Abrey Farms

Services Provided

Planning Drawings, Flood Risk Assessment, Phase 1 & 2 Contamination, Drainage Design, Setting Out, Topographical Survey, Civil Engineering, Civil Management, Structural Design, Containment Design, Silage Clamp Design, Digestate Lagoon Design, Permitting Consultation, EA sign off