| |
| t |
|
|
|
| |
Temporary works design |
|
| |
Our input can be part of the enabling works for a larger permanent design we are undertaking or purely temporary works design on a project in which we have no further input. Works can vary from such matters as structural stabilisation of buildings, limpet dam access to quayside to lifting frames. |
|
| |
|
|
|
| |
|
| Three-dimensional (3D) digital terrain modeling |
| Computer generated models of existing ground surfaces to be contoured or shown in a rendered 3D model. Design or quantification of earthworks can be provided by model. |
|
|
| |
|
|
|
| |
|
| Three-dimensional (3D) finite element analysis |
| Plandescil can utilise specialist software to produce detailed structural analysis of complex structures. |
|
|
| |
|
|
|
| |
|
| Tree surveys |
| Preparing small arboricultural reports to accompany planning application. |
|
|