| |
| f |
|
|
|
| |
Flood risk assessments |
|
| |
Preparing reports assessing the likely risk of flooding on site after buildings and hardened areas have been constructed, which prevent the natural flow of water into the ground. These reports are often required by the Environment Agency prior to planning permission being given. |
|
| |
|
|
|
| |
|
| Flood risk surveys using GPS active network |
| Comparing GPS Level Survey Data against EA Data for insurance purposes and for the complying Flood Risk Assessment Reports for planning purposes. |
|
|
| |
|
|
|
| |
|
| Foul and surface water sewer design |
| The design of systems to remove foul (waste) water and surface (rain) water from sites and properties. |
|
|
| |
|
|
|
| |
|
| Foundation design and ground improvements |
The design of foundations required for all types of structures and in
all sorts of ground. |
|
|